Showing 2 posts from October 2024.

In Barclay Lofts LLC v. PPG Industries, Inc., Case No. 20-CV-1694, 2024 WL 4224731 (E.D. Wis. Sept. 18, 2024), a United States District Court in Wisconsin, after deciding several threshold issues under CERCLA, allocated liability for past and future response costs to clean up a contaminated site based upon a detailed analysis of the operational and material handling practices of the potentially responsible parties.  The decision offers insights about the facts that a court may find compelling and the factors that a court may apply to reach an equitable CERCLA allocation among responsible parties. Read More »

On September 27, 2024, in Short Creek Development, LLC v. MFA Incorporated, No. 22-05021-CV-SW-WBG, 2024 WL 4326815 (W.D. Mo. Sept. 27, 2024), Magistrate Judge W. Brian Gaddy determined Plaintiffs’ claim under Section 107(a) of the Comprehensive Environmental Response, Compensation, and Liability Act (“CERCLA”) was barred by the applicable statute of limitations as “physical on-site construction of the remedial action” occurred more than six years prior to when Plaintiffs brought their lawsuit.  Specifically, the Magistrate Judge found that costs related to a leachate collection system constructed approximately a year before the adoption of a Record of Decision (“ROD”) amendment outlining a permanent remedy for the Orongo-Duenweg Mining Belt Superfund Site (the “Site”) was the beginning of the six-year limitations period.   In doing so, the Court rejected adoption of a “bright-line” rule that remedial actions begun before adoption of a final remedial plan do not trigger the limitations period.  Read More »