{ Banner Image }
Search this blog

Subscribe for updates

Recent Posts

Blog editor

Blog Contributors

Showing 3 posts in Missouri.

On September 27, 2024, in Short Creek Development, LLC v. MFA Incorporated, No. 22-05021-CV-SW-WBG, 2024 WL 4326815 (W.D. Mo. Sept. 27, 2024), Magistrate Judge W. Brian Gaddy determined Plaintiffs’ claim under Section 107(a) of the Comprehensive Environmental Response, Compensation, and Liability Act (“CERCLA”) was barred by the applicable statute of limitations as “physical on-site construction of the remedial action” occurred more than six years prior to when Plaintiffs brought their lawsuit.  Specifically, the Magistrate Judge found that costs related to a leachate collection system constructed approximately a year before the adoption of a Record of Decision (“ROD”) amendment outlining a permanent remedy for the Orongo-Duenweg Mining Belt Superfund Site (the “Site”) was the beginning of the six-year limitations period.   In doing so, the Court rejected adoption of a “bright-line” rule that remedial actions begun before adoption of a final remedial plan do not trigger the limitations period.  Read More »

On May 18, 2022 in York et al. v. Northrop Grumman Corp. Guidance and Electronics Co. Inc. et al., No. 21-cv-03251 (W.D. Mo.), a Missouri federal court dismissed Plaintiffs’ complaint alleging negligence, nuisance and trespass from alleged groundwater contamination, finding the claims were preempted by an existing consent decree. Read More »

Last week, the United States Court of Appeals for the Eighth Circuit affirmed a district court’s ruling to decertify a class action filed by landowners for releases from Exxon’s 850-mile Pegasus Pipeline that crosses four states from Texas to Illinois.  The case, Webb, et al. v. Exxon Mobil Corp., et al., Dkt. No. 15-2879 (8th Cir., May 11, 2017), was filed by a group of landowners who claimed that Exxon materially breached the terms of their right-of-way easement agreements by allegedly failing to inspect, maintain, repair, and replace the pipeline, which was originally installed in the mid-1940s.  At various times since the 1980s, the pipeline had releases in Texas, Arkansas, and Missouri, which the plaintiffs claim resulted in damage to their properties.  The plaintiffs sought to rescind their right-of-way easement agreements and force Exxon to remove or replace the entire pipeline, or in the alternative, to be paid damages for breach of contract and diminution in property value.  Read More »